Requisitions guide: Difference between revisions
Line 31: | Line 31: | ||
All manner of materials used for defensive structures are used here. The most notable ones are Metal Sheets and Plasteel Sheets. These are ordered all the time by Requisitions at the start of the round because Combat Technicians require more than just a few stacks of Materials to make an FOB/ Defensive Supply Depot. | All manner of materials used for defensive structures are used here. The most notable ones are Metal Sheets and Plasteel Sheets. These are ordered all the time by Requisitions at the start of the round because Combat Technicians require more than just a few stacks of Materials to make an FOB/ Defensive Supply Depot. | ||
This is one of the most demanded things in Requisition as vendors don't have steel sheets. | |||
2.Firearm Needs. | 2.Firearm Needs. | ||
The magazines and the guns go here most of the time marines will almost always want a uprgaded version of the mags than the non upgraded ones. This can be fulfilled in line work with the few Ap/Extended magazines in Vendor Rezerves however, ordering regular magazines have proven to be a waste/useless investment not worth doing until the vendor rezerves are sent to FOB and | The magazines and the guns go here most of the time marines will almost always want a uprgaded version of the mags than the non upgraded ones. This can be fulfilled in line work with the few Ap/Extended magazines in Vendor Rezerves however, ordering regular magazines have proven to be a waste/useless investment not worth doing until the vendor rezerves are sent to FOB and are expended . lots of people prefer AP boxes over Regular magazine boxes so mostly ammunition won't be needed to ordered until all the regular/ ap magazines are expended in FOB and marines are demanding magazine boxes. | ||
Special ammunition and firearms needs to be ordered regardless of ammunition advice given above. | |||
3.Explosive Needs | 3.Explosive Needs | ||
Mortar shells, HEDP packets, Rockets, Breaching charges. marines will almost always need explosives for their AOE/Destructive capabilities. instant burst damage is insanely valuable especially if it has area denial like say in the case of a HIDP or a Incindiary Mortar from CM13. AP rockets notably are much much better than HE rockets as a sadar usually need one or two rockets to kill a xeno. For mortars and HEDP packets it doesn't matter which one you choose however i reccomend a emphasis on HE for mortars and a emphasis of HEDP in the case of mortars. | |||
4.Utilitiary Needs | 4.Utilitiary Needs |
Revision as of 12:17, 9 September 2024
What is Requisitions?
Requisitions is a support department located on board the Almayer (or Savannah). It is tasked with ordering, maintaining, deconstructing, or otherwise procuring supplies for the entire operation. This can include anything from sandbags, to ammunition, to medical supplies, or even sustenance if it is required.
The way Requisitions achieves this is by expenditure on the ASRS (Automatic Storage Retrieval System) Console. The ASRS contains almost anything that you can possibly imagine to wage, and win, wars on the ground. Requisitions can additionally utilize on-ship vendors and autolathes to acquire gear and materials if required.
The chain of command of Requisitions can be found in Chain of command.
Line Work
Line work is the practice of fulfilling orders at the beginning of the mission for every marine waking up from hypersleep. Marines will line up at the requisition line, where either the Cargo Technicians or Quartermaster will supply them with whatever it is they require. This is one of the most important roles of Requisition, and will usually take up most of their early round. To help Requisition in supplying every marine, there are five important vendors with which you should be accommodated to.
Attachments Vendor
- Generally what most Marines will be asking for at the beginning of a mission, this vendor is packed with all manner of attachments for every gun in the Marine arsenal.
General Vendor
- Contains guns, pouches, mortal belts and mortar backpacks. Also contains restricted weaponry, and explosive devices such as grenades.
Ammunition Vendor
- Provides all manner of ammunition for every weapon in the Marine arsenal.
Autolathe
- Can be used to manufacture basic items such as surgical or engineering equipment without the need to order from the ASRS.
Clothes Vendor
- Contains spare bags and armors if needed.
Expenditure/What to order?
The marines have certain needs in the war. These are:
1.Material Needs
All manner of materials used for defensive structures are used here. The most notable ones are Metal Sheets and Plasteel Sheets. These are ordered all the time by Requisitions at the start of the round because Combat Technicians require more than just a few stacks of Materials to make an FOB/ Defensive Supply Depot.
This is one of the most demanded things in Requisition as vendors don't have steel sheets.
2.Firearm Needs.
The magazines and the guns go here most of the time marines will almost always want a uprgaded version of the mags than the non upgraded ones. This can be fulfilled in line work with the few Ap/Extended magazines in Vendor Rezerves however, ordering regular magazines have proven to be a waste/useless investment not worth doing until the vendor rezerves are sent to FOB and are expended . lots of people prefer AP boxes over Regular magazine boxes so mostly ammunition won't be needed to ordered until all the regular/ ap magazines are expended in FOB and marines are demanding magazine boxes.
Special ammunition and firearms needs to be ordered regardless of ammunition advice given above.
3.Explosive Needs
Mortar shells, HEDP packets, Rockets, Breaching charges. marines will almost always need explosives for their AOE/Destructive capabilities. instant burst damage is insanely valuable especially if it has area denial like say in the case of a HIDP or a Incindiary Mortar from CM13. AP rockets notably are much much better than HE rockets as a sadar usually need one or two rockets to kill a xeno. For mortars and HEDP packets it doesn't matter which one you choose however i reccomend a emphasis on HE for mortars and a emphasis of HEDP in the case of mortars.
4.Utilitiary Needs
Contents of ASRS and Vendors
How is Money Generated?
There are two ways money is generated in Requisitions.
- You passively gain a certain amount of money over based on the number of marines on mission.
- All orders come with invoices. Said invoices give a small sum of money which can be used to acquire new items. (300 per stamped invoice)
Budget Balancing
The Thought of Requisition Banking
The original thought that comes from CM13. Requisitions Banking argues that Requisitions should be like a bank/insurance company. keeping large reserves of cash so as to order anything that is short in supplies and keep the operation running by maintaining a balanced budget and supply of goods.